Rail services on FERROVIENORD’s Seveso–Camnago and Seveso–Meda sections will be suspended from the end of service on Friday 29 May until services resume on Wednesday 3 June. The suspension is necessary to allow the final segment of the monolithic structure for the new station underpass currently under construction in Seveso to be pushed into place. During the suspension, work will also be carried out to renew the tracks at the level crossing on Via Marconi in Barlassina, which will remain closed from 10 p.m. on 30 May until 12 noon on Monday 1 June.
CHANGES TO RAIL SERVICES – The works will result in changes to services on the Milano Cadorna–Asso and S4 Milano Cadorna–Camnago lines.
In particular, on the Milano Cadorna–Asso line, train services between Milano Affori and Meda will be suspended from Saturday 30 May to Tuesday 2 June. A replacement bus service will operate between the two stations, stopping at Seveso.
On the S4 line, train services between Seveso and Camnago will be suspended on 30 and 31 May and 2 June. Replacement buses will connect the two stations, while trains will continue to operate between Seveso and Milano Cadorna.
On 1 June, train services on the S4 line will be suspended between Palazzolo and Camnago. A replacement bus service will operate between Seveso and Camnago. Passengers travelling between Seveso and Milan can use S2 line services between Mariano Comense, Milano Passante and Milano Rogoredo.
Updated train and bus timetables will be available on trenord.it and the Trenord app.
VIA MARCONI LEVEL CROSSING – The level crossing on Via Marconi in Barlassina will be closed to road traffic from 10 p.m. on Saturday 30 May until 12 noon on Monday 1 June to allow track renewal works to be carried out.
During this period, heavy goods vehicles (vehicles weighing more than 3.5 tonnes) will not be permitted to access Via Capuana. For light vehicles (weighing less than 3.5 tonnes) and emergency vehicles travelling to Via Capuana, a temporary access route will be provided at the junction of Via Capuana and Via Milano/S. Carlo.
UPGRADING THE SEVESO RAILWAY HUB – The works to upgrade the Seveso railway hub include, among other things, the refurbishment of railway systems and platforms, the doubling of the Seveso–Camnago Lentate and Seveso–Meda sections, the construction of a road underpass connecting Via Zeuner and Via Sanzio, and the construction of a pedestrian and cycle overpass on Via Manzoni.
All information and updates are available at: https://www.ferrovienord.it/interventi-in-corso/
REPORTING CHANNEL AND INFORMATION POINT – For any questions, requests or clarification regarding the works, railway infrastructure or FERROVIENORD stations, members of the public can submit a report using the procedures published at: https://www.ferrovienord.it/segnalazioni-e-reclami/.
An Information Point for construction works has also opened at Milano Cadorna station. This space provides an opportunity for dialogue, listening and information, where members of the public can access up-to-date materials, ask questions, report any issues and gain a better understanding of the changes underway across the FERROVIENORD network.
The Information Point is located in the entrance corridor, on the right-hand side of the station, and is open to the public from Monday to Thursday, from 8:30 a.m. to 12:30 p.m.